Insulation Information








See bottom between wooden frame

Step 1: Sound Deadener
Step 2: Thinsulate (see bottom - back)
Step 3: Reflextic - See bottom (Silveer)

  

Purchase

2) Stainless steel Rivet size in Promaster to buy::

1/4″ 20
5/16″ 18
#10-24


3) 1 1/4″ stainless steel long bolts to buy:

#10-24,
1/4″-20
5/16″-18


4) Furring Strip

Ceiling: 1 x 3 inch Poplar wood
Sidewalls: 1×2 inch furring strips

Furring strip on front and back a little more tedious - read blog above.


Installation 

1) Put Rivet in all the holes.

2) Put sound deadening on each big wall spot

3) Apply 3M 90 spray and put Thinsulate on wall and stuff it in every nook and cranny

4) Add Low-E or EZCool to exposed metal.

5) Add Furring Strip